Bright Blast Powering better blasts through rock intelligence.

Bright Blast is AI-based software that turns current drilling data into accurate predictions of rock-mass hardness for adjacent benches and future phases. Blast design and powder factor are adjusted to that hardness, optimizing the processes upstream and downstream.

The block model says what the rock should be. Bright Blast says what it is, bench by bench, before drilling.

02 · Bright Blast

03 How it works

A design can miss what changes across the bench.

The block model estimates hardness in large blocks. Within a single bench, the rock can vary enough to affect fragmentation, drilling and loading.

Without Bright Blast

Fragmentation risks

  • Oversize boulders
  • Excessive fines

Operational consequences

  • Suboptimal explosives consumption
  • Lower shovel excavation rate and utilization
  • Suboptimal drilling meters

With Bright Blast

See where the rock changes before you drill.

Bright Blast uses current drilling data to predict hardness across the next bench. Engineers can adapt the drill pattern and powder factor to each zone before issuing the design.

Explore the two cases
04 What it does

What Bright Blast does

Measurement While Drilling data is integrated and processed in near real time, bench by bench, as the drills transmit it.

Drilling data is processed into an estimate of the real hardness along the bench.

Predicts the rock-mass hardness of the next bench and future phases before they are drilled.

05 Features

Bench by bench, zone by zone, before the drill arrives.

Block model

Bright Blast

The same bench, before it is drilled, drawn twice at one size. The block model sees it in four large blocks: three medium, one hard. Bright Blast maps it zone by zone on a georeferenced grid: a soft area with a very soft pocket, medium ground, and a hard band with a very hard pocket.

Hardness scale

  1. Very soft
  2. Soft
  3. Medium
  4. Hard
  5. Very hard

01

Anticipation

The next bench’s hardness is predicted before drilling, not discovered after. The design is issued with information, not waiting for it.

02

Made to measure

Bright Blast adapts to the data your drills transmit and to your operation’s own characteristics.

03

Resolution

Bright Blast resolves the hardness zone by zone, georeferenced, within the same bench, where the block model sees large blocks.

06 Cases

Two decisions, taken before drilling

Case 1

Softer rock than the model

Detect
The bench will be softer than the hardness the model assigned.
Decide
Widen the pattern and lower the powder factor before issuing the design.
Illustrative drill pattern on softer rock. Left, the block model's 7.0 × 8.0 m pattern, shown as rings on ground it classifies as hard. Right, Bright Blast's 9.0 × 10.5 m pattern, shown as dots on the predicted soft ground.

Case 2

Harder rock than the model

Detect
Bright Blast predicts a hard zone in ground the block model classifies as soft.
Decide
Tighten the pattern and raise the powder factor only where the rock demands it.
Illustrative drill pattern with a hard zone. Left, the block model's 7.0 × 8.0 m pattern, shown as rings on ground it classifies as soft. Right, Bright Blast's design keeps the base spacing on soft ground and tightens it to 6.0 × 6.5 m in the hard zone.

Drill patterns are illustrative examples for large-scale mining. Site designs depend on local conditions.

07 Implementation

About four months to go live, with data visible as early as the third month.

Phase 011 to 4 months*

Drill data integration

Drilling data is connected; how long depends on the data available and its structure.

Phase 022 weeks

Model setup

The model is set up on the operation’s data, structured for the pilot.

Phase 032 weeks

Web platform

A dedicated platform is deployed for the site and users are trained on it, its file formats and processes.

Phase 042 weeks

Technical validation

Mine and Enaex teams validate the model and its predictions in a pilot, with continuous feedback.

Phase 05Ongoing

Follow-up

Predictions are reviewed periodically against the drilled benches.

*This stage can take longer due to internal procedures or data structure requirements.

08 Demo

See it in a live demo

Our engineers walk you through the hardness of the current bench and the prediction for the next. The pilot runs it on your own drilling data.

Illustration: a drilled bench drawn as a block, a drill rig working on its surface. A hardness map in five classes, from very soft in blue to very hard in red, colours the surface and the strata through the depth below it.
  1. Hardness of the current bench
  2. Hardness of the next bench
09 Contact

Connect your operation to the mining of the future

Book a live demonstration with our engineers and see how Bright Blast would work on your operation.

Or write to us at soportebright@enaex.com